Business
Smart Equipment · Green Manufacturing · Service-oriented · Digitalization
Wuxi Huali Juneng Equipment Co., Ltd. is one of the earliest privately owned enterprises in China to enter nuclear power equipment manufacturing. The company organizes production strictly in accordance with nuclear safety regulations and standards such as HAF 604, RCC-M, and ASME III, and has established a comprehensive nuclear-grade quality assurance system. Its products cover nuclear-grade pressure vessels, heat exchangers, storage tanks, nuclear island auxiliary system equipment, and more, and have been successfully applied in nuclear power projects including Qinshan, Tianwan, and Fuqing.

Nuclear-Grade Pressure Vessels
The company can design and manufacture Class 2 and Class 3 nuclear pressure vessels. Advanced finite element analysis is used for strength calculation and stress analysis, ensuring safe and reliable performance under extreme operating conditions. Products are widely used in nuclear island and conventional island systems.

Nuclear-Grade Heat Exchangers
Huali Energy provides various nuclear-grade heat exchangers for nuclear power plants, including shell-and-tube and plate heat exchangers. High-efficiency heat transfer technology and anti-vibration design ensure safe, reliable long-term operation, with service life exceeding 40 years.

Nuclear Island Auxiliary System Equipment
The company supplies demineralized water tanks, boric acid storage tanks, waste liquid treatment equipment, and other nuclear island auxiliary equipment. Strict material and process control meets nuclear safety requirements for sealing performance and corrosion resistance.

Conventional Island Equipment
For conventional islands in nuclear power plants, Huali Energy provides heat exchangers, condensers, deaerators, heaters, and related equipment. Product design fully considers the long operating cycles of nuclear power plants, delivering high reliability and long service life.
Nuclear Energy Equipment Application Cases
Nuclear-Grade Heat Exchanger Project for a Nuclear Power Plant
The company supplied multiple Class 2 nuclear heat exchangers for a million-kilowatt nuclear power unit. The 18-month project passed owner and regulator acceptance on the first submission and received strong recognition from the customer.


